Shengda Logistics and Warehousing Center Flooring Project

The Shengda logistics warehouse handles over a thousand forklift trips daily, necessitating basic requirements for floor flatness and wear resistance. Simon WEP-G100 offers a leveling property ≥200mm and compressive strength ≥60MPa. Its high cost-effectiveness meets the medium to heavy-duty demands of the warehouse, with a construction cycle of only 5 days, enabling a quick return to warehouse operations.

Shengda Logistics and Warehousing Center Flooring Project
Applied Products

Applicable Scenarios:
Commercial complexes, office building corridors, ordinary industrial workshops, school classrooms, hospital hallways, underground garages (non-heavy load)

Coating Thickness: 2-3mm

Core Features:
The seamless, smooth, and easy-to-clean matte/high-gloss coating, suitable for various base layers, is a cost-effective flooring solution for commercial and general industrial spaces

Key Technical Parameters:
Compressive strength ≥ 60MPa, tensile strength ≥ 12MPa, wear resistance ≤ 35mg, leveling property ≥ 200mm, surface dryness ≤ 4h / full dryness ≤ 24h

Related Cases

Applied Products: Simon WEP-G100 General Purpose Epoxy Self-Leveling

Project Scale: 8000㎡

Client Industries: Logistics & Warehousing

The Shengda logistics warehouse handles over a thousand forklift trips daily, necessitating basic requirements for floor flatness and wear resistance. Simon WEP-G100 offers a leveling property ≥200mm and compressive strength ≥60MPa. Its high cost-effectiveness meets the medium to heavy-duty demands of the warehouse, with a construction cycle of only 5 days, enabling a quick return to warehouse operations.
All